Building A Wood Crate – Allen & Joe

PART I

“I feel a real sense of accomplishment when Joe and I assemble our crest. I think that is the reason why I always enjoy being a Handmaker.”

I grew up on a farm. For me, I would say I am “not strange” with the equipment in the woodshop, as well as using the miter saw. I remember I did some woodwork with my grandparents when I was a child. However, as you know, my grandparents always worried that I might get hurt while operating these tools. So, they always avoid me to use these tools. Over time, I did not have the chance to familiarize myself with them.
.
When I studied away from home, I started to have a chance and space to fix a build some stuff by myself. Especially when I see something is broken, I always have the impulse to fix it. I know “the spirit of handmarker” is not away from me.


PART II

Even though I have less experience with woodwork, Joe is still willing to group with me and give me a lot of chances to practice.

  • We cut and polished wood together. Also, Joe provided many tips to me.
  • Last Friday, when I completed the first layer of the crate, I was so proud of myself.
  • Later, we started to assemble the remaining parts to finish it.
        
  • Last but not least, Joe spent a lot of time painting the oil and making the surface of the crate smoother in order to make this crate perfect. I have followed many handmade-related YouTubers. I totally understand it is important and time-consuming. Thank you, Joe.
    Before                                  After
       
  • The clean table after I used it.

PART III

Cost Type

Cost Price Source Quantity

Total

Materials 1×4 Board (8 ft) $4.47 The Home Depot
(OEDK)
3 $13.41
2×2 Lumber (8 ft) $4.98 The Home Depot
(OEDK)
1 $4.98
Screws $0.06 The Home Depot
(OEDK)
54 $3.24
Sand Paper $6.00 The Home Depot
(OEDK)
4 $24.00
Labor Woodworking Operator $17.65 Joe and I (Indeed) 10 $176.50
Prototyping Engineer (You!) $0.00 Class document 0 $0.00
Overhead Facility Cost (Machine Time) $58.00 PEERSPACE 11 $638.00
Quality Control $21.01 Joe (Indeed) 4 $84.04
Design Engineering and Development $0.00 Class document 0 $0.00
Iterations $0.00 Class document 0 $0.00
Misc. Waste and Scrap $0.00 OEDK 0 $0.00

Total: 944.17